Ultra Controlo concluded a training programme for its engineers in the Democratic Republic of the Congo, so they can support customers and keep their oxygen supply uninterrupted.
Ultra Controlo shipped a new order of ULTRAOX medical oxygen generators to the Democratic Republic of the Congo.
A specialised Ultra Controlo team arrived in Bandundu for the initial site assessment, to identify site-specific challenges and draft a preliminary implementation plan.
The ULTRAOX medical oxygen plant at the BONZOLA General Reference Hospital in Mbujimayi, the provincial capital of Kasai Oriental, was inaugurated on 3 November 2023.
Ultra Controlo shipped new ULTRAOX medical oxygen systems to Lisala, Kenge and Kamina, for healthcare facilities in regions that face ongoing challenges in medical infrastructure and oxygen supply.
Two new ULTRAOX systems arrived at Port TFCE in Kinshasa, heading to Kenge and Lisala hospitals as part of Lot 2.
The ULTRAOX plant at the BONZOLA General Reference Hospital was inaugurated on 3 November 2023 in the presence of the Deputy Minister of Public Health, Hygiene and Prevention, and can fill up to 50 cylinders of 50 litres a day.
The national Lot 2 project covers the supply and installation of three complete oxygen production and cylinder-filling systems; two ULTRAOX systems for the hospitals of Kenge and Lisala arrived at Port TFCE in Kinshasa in September 2025.
In November 2022 Ultra Controlo concluded a training programme for its engineers in the Democratic Republic of the Congo, so they can support customers and keep their oxygen supply uninterrupted.
Ultra Controlo is a Portuguese company that designs and manufactures medical gas systems for hospitals.
ULTRAOX plant models range from 3.10 Nm³/h of oxygen on ULTRAOX 30 to 165.3 Nm³/h on ULTRAOX 1640, delivered at 5 to 6 bar; each plant has one or two ULTRACON oxygen generators.
ULTRAOX plants leave the factory pre-wired, parameterised and tested, ready to start on site, and on large plants Ultra Controlo’s factory technicians supervise installation, start-up and staff training.
Questions hospitals ask us about on-site oxygen. More on the medical gas answers page.
News on this site tells of an ULTRAOX plant inaugurated at the BONZOLA General Reference Hospital in Mbujimayi, Kasai Oriental, in November 2023, and of ULTRAOX systems shipped to Lisala, Kenge and Kamina in June 2025.
Two ULTRAOX systems for the hospitals of Kenge and Lisala arrived at Port TFCE in Kinshasa in September 2025, as part of the national Lot 2 project, and in May 2023 an Ultra Controlo team began the initial site assessment in Bandundu.
Connect ULTRAFIL to ULTRAOX and fill your own medical oxygen cylinders on site.
An ULTRAFIL filling station takes racks of 5, 10 or 20 cylinders and fills them at a maximum pressure of 150 to 207 bar, depending on the model.
In Mbujimayi, the ULTRAOX plant can fill up to 50 cylinders of 50 litres every day, and the national Lot 2 project covers three complete oxygen production and cylinder-filling systems.
Ultra Controlo is certified to ISO 13485:2016 for medical devices, ISO 9001:2015 for quality management and ISO 14001 for environmental management. ULTRAOX oxygen plants carry CE marking as Class IIb medical devices through notified body 1639 (SGS), with the whole plant certified as a single medical device, and are built to EN ISO 7396-1. For tenders, Ultra Controlo provides its certificates, CE declarations of conformity and technical dossiers.
UltraCare is Ultra Controlo’s technical assistance programme for its medical gas systems, available 24 hours a day, 365 days a year. It covers preventive maintenance and monitoring, corrective service, original spare parts and rental equipment while a unit is serviced.
In the Democratic Republic of the Congo, Ultra Controlo concluded a training programme for its engineers in November 2022.
Tell us about your site. Our engineering team sizes the configuration and sends a quote.