UNICEF, with the Global Fund, has supplied oxygen plants to regional hospitals in Guinea, and in 2026 the Ministry of Health opened an international tender, financed by the Islamic Development Bank, for a medical fluids system. This guide sets out those public facts and what to check before you buy.
Two public facts shape a purchase in Guinea: the regional hospital oxygen plants supplied with UNICEF and the Global Fund, and the 2026 tender financed by the Islamic Development Bank.
UNICEF reports that, since installation, the four plants at Mamou, Faranah, Boké and Kindia have supported more than 7 495 patients, and that before them most oxygen was imported in bottles at around 1 500 000 GNF each. The Kindia neonatal unit head says power cuts used to force the unit onto costly generators.
The 2026 notice asked for a medical fluids system and air treatment units for the CESFARH under the Post-Ebola Health Sector Support Project, with bids due on 25 July 2026. This page does not describe any registration procedure for medical devices in Guinea: ask the Ministry of Health in writing what applies to a PSA oxygen plant.
Press counts of plants in operation differ between reports. The figures above are as each source gives them.
Short and specific to a purchase in Guinea. The general method is in the guides linked below.
Ask whether UNICEF, the Global Fund, the Islamic Development Bank or the Ministry is the contracting authority. The 2026 notice accepted paper bids only and put the tender document at 1 500 000 GNF, so plan for delivering a paper bid to the address in Conakry.
Tell us how often the supply is cut and what generator or UPS the site has. Kindia’s neonatal unit says it relied on costly generators before its plant.
A press report on the Faranah inauguration says the plant will also supply nearby facilities once training is completed at other centres. Ask for training and a maintenance plan in the order, not after handover.
UNICEF says that, with the support of the Global Fund, it supplied the Ministry of Health and Public Hygiene with four oxygen plants, installed at the regional hospitals of Mamou, Faranah, Boké and Kindia. At the inauguration in Faranah on 16 December 2025, UNICEF’s representative said it is helping the government improve access to medical oxygen in regional hospitals.
A press report on the Boké inauguration of 23 October 2025 said seven regional plants were planned. The press counts of plants in operation differ between reports, so check the current list with the Ministry.
Notice AOI N°03/PASSPE/MSHP/2026 was an international open tender from the Ministry of Health and Public Hygiene, financed by the Islamic Development Bank under the Post-Ebola Health Sector Support Project (PASSPE). It asked for the supply, installation, commissioning and training for a medical fluids production and distribution system and air treatment units for the CESFARH, in a single lot.
Bids were due on 25 July 2026 at 10:00 GMT, on paper only, with a bid security of 15 450 euros, and the tender document cost 1 500 000 GNF. This page reports no award.
UNICEF’s June 2026 account says most oxygen was previously imported at very high prices, around 1 500 000 GNF per bottle. It does not say the bottle size. At Boké, the hospital’s maintenance manager is quoted saying the hospital no longer waits for distant external supplies.
This is UNICEF’s reported figure, not a comparison of costs.
UNICEF’s June 2026 account quotes the head of the neonatal unit at the Kindia regional hospital, who says power cuts used to force the unit to use costly generators and that the new plant has been a big step. The library answer on backup generators and UPS explains what a plant needs from the site supply.
No news story on this site reports an Ultra Controlo project in Guinea. This page is a buying guide, built from public sources.
Ultra Controlo is certified to ISO 13485:2016 for medical devices, ISO 9001:2015 for quality management and ISO 14001 for environmental management. ULTRAOX oxygen plants carry CE marking as Class IIb medical devices through notified body 1639 (SGS), with the whole plant certified as a single medical device, and are built to EN ISO 7396-1. For tenders, Ultra Controlo provides its certificates, CE declarations of conformity and technical dossiers.
UltraCare is Ultra Controlo’s technical assistance programme for its medical gas systems, available 24 hours a day, 365 days a year. It covers preventive maintenance and monitoring, corrective service, original spare parts and rental equipment while a unit is serviced.
ULTRAOX is designed for a minimum life cycle of 150,000 hours, which Ultra Controlo presents as an investment for at least 20 years.
Tell us about your site. Our engineering team sizes the configuration and sends a quote.