Africa Guinea Buying guide

Buying a PSA oxygen plant in Guinea.

UNICEF, with the Global Fund, has supplied oxygen plants to regional hospitals in Guinea, and in 2026 the Ministry of Health opened an international tender, financed by the Islamic Development Bank, for a medical fluids system. This guide sets out those public facts and what to check before you buy.

ULTRAOX medical oxygen plant: air and oxygen tanks, ULTRACECO compressor, air treatment, ULTRACON generators and the backup cylinder bank
What public sources say

What buyers in Guinea can verify.

Two public facts shape a purchase in Guinea: the regional hospital oxygen plants supplied with UNICEF and the Global Fund, and the 2026 tender financed by the Islamic Development Bank.

UNICEF reports that, since installation, the four plants at Mamou, Faranah, Boké and Kindia have supported more than 7 495 patients, and that before them most oxygen was imported in bottles at around 1 500 000 GNF each. The Kindia neonatal unit head says power cuts used to force the unit onto costly generators.

The 2026 notice asked for a medical fluids system and air treatment units for the CESFARH under the Post-Ebola Health Sector Support Project, with bids due on 25 July 2026. This page does not describe any registration procedure for medical devices in Guinea: ask the Ministry of Health in writing what applies to a PSA oxygen plant.

Guinea
Public sources, read 19 November 2026
Regional hospital plants
Four plants supplied by UNICEF with Global Fund support, installed at the regional hospitals of Mamou, Faranah, Boké and Kindia (UNICEF Guinea, 28 June 2026)
Reported use
More than 7 495 patients since installation: 3 229 pregnant women, 2 000 newborns in respiratory distress and 2 266 other patients (UNICEF)
Kindia, January 2026
80 newborns admitted in respiratory distress and 5 deaths, as reported by UNICEF
Inaugurations
Boké on 23 October 2025, Mamou on 4 December 2025 and Faranah on 16 December 2025; seven regional plants were planned (press reports)
2026 tender
AOI N°03/PASSPE/MSHP/2026, financed by the Islamic Development Bank: a medical fluids production and distribution system and air treatment units for the CESFARH, bids due 25 July 2026
Bottle price before
Around 1 500 000 GNF per bottle for imported oxygen, as reported by UNICEF

Press counts of plants in operation differ between reports. The figures above are as each source gives them.

Before you buy

Three checks before you request a quote.

Short and specific to a purchase in Guinea. The general method is in the guides linked below.

01

Read the funder’s rules

Ask whether UNICEF, the Global Fund, the Islamic Development Bank or the Ministry is the contracting authority. The 2026 notice accepted paper bids only and put the tender document at 1 500 000 GNF, so plan for delivering a paper bid to the address in Conakry.

02

Plan for the grid

Tell us how often the supply is cut and what generator or UPS the site has. Kindia’s neonatal unit says it relied on costly generators before its plant.

03

Train and service from day one

A press report on the Faranah inauguration says the plant will also supply nearby facilities once training is completed at other centres. Ask for training and a maintenance plan in the order, not after handover.

Frequently asked questions

Questions from buyers in Guinea.

More on the medical gas answers page.

Who supplied the regional hospital oxygen plants in Guinea?

UNICEF says that, with the support of the Global Fund, it supplied the Ministry of Health and Public Hygiene with four oxygen plants, installed at the regional hospitals of Mamou, Faranah, Boké and Kindia. At the inauguration in Faranah on 16 December 2025, UNICEF’s representative said it is helping the government improve access to medical oxygen in regional hospitals.

A press report on the Boké inauguration of 23 October 2025 said seven regional plants were planned. The press counts of plants in operation differ between reports, so check the current list with the Ministry.

What was the 2026 medical fluids tender in Guinea?

Notice AOI N°03/PASSPE/MSHP/2026 was an international open tender from the Ministry of Health and Public Hygiene, financed by the Islamic Development Bank under the Post-Ebola Health Sector Support Project (PASSPE). It asked for the supply, installation, commissioning and training for a medical fluids production and distribution system and air treatment units for the CESFARH, in a single lot.

Bids were due on 25 July 2026 at 10:00 GMT, on paper only, with a bid security of 15 450 euros, and the tender document cost 1 500 000 GNF. This page reports no award.

What did oxygen cost in Guinea before the regional plants?

UNICEF’s June 2026 account says most oxygen was previously imported at very high prices, around 1 500 000 GNF per bottle. It does not say the bottle size. At Boké, the hospital’s maintenance manager is quoted saying the hospital no longer waits for distant external supplies.

This is UNICEF’s reported figure, not a comparison of costs.

What do hospitals in Guinea say about power cuts?

UNICEF’s June 2026 account quotes the head of the neonatal unit at the Kindia regional hospital, who says power cuts used to force the unit to use costly generators and that the new plant has been a big step. The library answer on backup generators and UPS explains what a plant needs from the site supply.

Does Ultra Controlo have projects in Guinea?

No news story on this site reports an Ultra Controlo project in Guinea. This page is a buying guide, built from public sources.

Which certificates does Ultra Controlo provide for a tender?

Ultra Controlo is certified to ISO 13485:2016 for medical devices, ISO 9001:2015 for quality management and ISO 14001 for environmental management. ULTRAOX oxygen plants carry CE marking as Class IIb medical devices through notified body 1639 (SGS), with the whole plant certified as a single medical device, and are built to EN ISO 7396-1. For tenders, Ultra Controlo provides its certificates, CE declarations of conformity and technical dossiers.

Who services an ULTRAOX plant after handover?

UltraCare is Ultra Controlo’s technical assistance programme for its medical gas systems, available 24 hours a day, 365 days a year. It covers preventive maintenance and monitoring, corrective service, original spare parts and rental equipment while a unit is serviced.

ULTRAOX is designed for a minimum life cycle of 150,000 hours, which Ultra Controlo presents as an investment for at least 20 years.

Request a project assessment

Ready to discuss oxygen for your hospital?

Tell us about your site. Our engineering team sizes the configuration and sends a quote.

CE 1639
Class IIb
ISO 13485:2016
80+ countries
40 years