News on this site tells of the ULTRAOX medical oxygen production system that Ultra Controlo delivered at Hospital Dr. Agostinho Neto in Praia, where it also installed a complete medical gas infrastructure. The Ministry of Health says the plant was implemented by the Government of Cabo Verde within its cooperation with the Global Fund.
Each card is a news story on this site, with its date, the place and what Ultra Controlo delivered, from the oldest to the latest.
Ultra Controlo delivered the ULTRAOX medical oxygen production system installed at Hospital Dr. Agostinho Neto (HUAN) in Praia. The Government of Cabo Verde inaugurated it at a ceremony presided over by the Vice Prime Minister and Minister of Finance and Digital Economy, alongside the Minister of Health.
During his State visit to Cabo Verde in July, the President of the Portuguese Republic, António José Seguro, visited the Dr. Agostinho Neto Hospital in Praia, the largest hospital in the country. The hospital’s medical oxygen plant, which lets it produce its own oxygen on site, was engineered and installed by Ultra Controlo.
The news describes an on-site plant built to produce oxygen at Hospital Dr. Agostinho Neto continuously, without dependence on external supply, and says producing oxygen locally reduces dependence on imported oxygen and on the logistics of moving it.
Oxygen is only part of the work: the August 2026 story says Ultra Controlo also installed medical vacuum, medical air, anaesthetic gas scavenging, nitrous oxide and the medical gas pipeline to every point of care in the hospital.
The same story says rooftop solar panels power part of this infrastructure, reducing running costs and adding resilience to a system a hospital cannot afford to lose.
A Ministry of Health note of 19 March 2026 says the medical oxygen production plant at Hospital Dr. Agostinho Neto in Praia was implemented by the Government of Cabo Verde, within its cooperation with the Global Fund to Fight AIDS, Tuberculosis and Malaria, through CCS-SIDA.
The note says the plant will let the country produce medical oxygen locally to international standards of quality and safety, and that local production will reduce the costs of importing, transporting and storing cylinders. The Vice Prime Minister, who presided over the inauguration with the Minister of Health, said the plant gives Santiago island autonomy in oxygen production.
In February 2023 the Ministry announced that the Global Fund had approved additional financing, under its COVID-19 Response Mechanism (C19RM), for oxygen production and installation at the country’s two central hospitals: Hospital Dr. Baptista de Sousa and Hospital Dr. Agostinho Neto.
This guide does not cover the registration of medical devices in Cabo Verde.
Decree-Law 11/2023 of 17 February 2023 set up Cabo Verde’s Plataforma Eletrónica de Contratação Pública, for public procurement procedures, at ecompras.gov.cv. Its preamble says electronic procedures will open the country’s public procurement to economic operators based abroad.
The address leads to eCOMPRAS.cv, the Ministry of Finance’s electronic public procurement portal, which has a procurement plan, lists of open and closed tenders and a supplier section for registration and access requests. The library answers linked below set out what the 2023 decree says about registration, how bids are protected and opened, and what happens to a deadline if the platform fails. This guide does not report any oxygen notice from the platform.
Short and specific to a purchase in Cabo Verde. The general method is in the guides linked below.
The Ministry of Health says the Agostinho Neto plant was implemented by the Government within its cooperation with the Global Fund, and the story on this site says the project was made possible by the Global Fund and i+solutions. Ask who funds and runs the purchase and, if it goes through eCOMPRAS.cv, check what the platform asks of suppliers well before the deadline.
The August 2026 story notes that in an island nation a break in supply can be measured in hours of flight or shipping. Tell us which island and hospital the plant is for, how equipment reaches the site and where the plant room will stand.
At Agostinho Neto, the news describes oxygen, medical air and vacuum installed together with the pipeline to every point of care. List every gas and point of care in your request, and tell us what power supply and backup the hospital has.
Ultra Controlo is a Portuguese company that designs and manufactures medical gas systems for hospitals.
ULTRAOX plant models range from 3.10 Nm³/h of oxygen on ULTRAOX 30 to 165.3 Nm³/h on ULTRAOX 1640, delivered at 5 to 6 bar; each plant has one or two ULTRACON oxygen generators.
ULTRAOX plants leave the factory pre-wired, parameterised and tested, ready to start on site, and on large plants Ultra Controlo’s factory technicians supervise installation, start-up and staff training.
Questions hospitals ask us about on-site oxygen. More on the medical gas answers page.
News on this site tells of the ULTRAOX medical oxygen production system that Ultra Controlo delivered at Hospital Dr. Agostinho Neto (HUAN) in Praia, inaugurated by the Government of Cabo Verde.
In July 2026 the President of Portugal visited the hospital, which the story calls the largest in the country, and its oxygen plant, engineered and installed by Ultra Controlo.
The news describes an on-site medical oxygen plant built to produce oxygen at the hospital continuously and without dependence on external supply. Ultra Controlo also installed medical vacuum, medical air, anaesthetic gas scavenging, nitrous oxide and the full medical gas pipeline that carries these gases to every point of care throughout the hospital.
A Ministry of Health note of 19 March 2026 says the plant was implemented by the Government of Cabo Verde, within its cooperation with the Global Fund to Fight AIDS, Tuberculosis and Malaria, through CCS-SIDA. In February 2023 the Ministry announced additional Global Fund financing, under the COVID-19 Response Mechanism, for oxygen production and installation at Hospital Dr. Agostinho Neto and Hospital Dr. Baptista de Sousa.
The story on this site says the project was made possible by the Global Fund and i+solutions, working with the Ministry of Health of Cabo Verde.
Decree-Law 11/2023 of 17 February 2023 set up the Plataforma Eletrónica de Contratação Pública at ecompras.gov.cv, which leads to eCOMPRAS.cv, the Ministry of Finance’s electronic public procurement portal. The portal has a procurement plan, lists of open and closed tenders and a supplier section for registration and access requests.
Ultra Controlo is certified to ISO 13485:2016 for medical devices, ISO 9001:2015 for quality management and ISO 14001 for environmental management. ULTRAOX oxygen plants carry CE marking as Class IIb medical devices through notified body 1639 (SGS), with the whole plant certified as a single medical device, and are built to EN ISO 7396-1. For tenders, Ultra Controlo provides its certificates, CE declarations of conformity and technical dossiers.
UltraCare is Ultra Controlo’s technical assistance programme for its medical gas systems, available 24 hours a day, 365 days a year. It covers preventive maintenance and monitoring, corrective service, original spare parts and rental equipment while a unit is serviced.
ULTRAOX is designed for a minimum life cycle of 150,000 hours, which Ultra Controlo presents as an investment for at least 20 years.
Tell us about your site. Our engineering team sizes the configuration and sends a quote.