Oman’s Ministry of Health is opening and building public hospitals, and its website links to the national e-tendering portal. This guide sets out what public sources say and what to check before you buy a PSA oxygen plant.
Ministry of Health news pages and the Oman Observer report several new public hospitals, from foundation stones laid in 2024 to openings in January 2026. All were read on 25 November 2026.
In February 2026 the Oman Observer put the Ministry of Health’s 2026 budget at approximately RO 1 billion and listed the Al Namaa, Samail and Mahout hospitals among more than 15 projects under construction during 2026 and 2027. The paper called the new Sultan Qaboos Hospital in Salalah one of the largest health projects in Oman, with 700 beds over seven floors. On 19 August 2026 the paper reported a visit by the Minister of Health, with work advancing towards completion and medical equipment already installed.
The Ministry laid the foundation stone of Al Falah Hospital, in South Al Sharqiyah, on 2 December 2024. Its announcement gives 170 beds, three operating rooms and about 150,000 residents to be served, and lists a fully integrated medical gas building with backup generators and a water treatment plant. The new Samail Hospital, in Ad Dakhiliyah, had its foundation stone laid on 12 June 2024, also for 170 beds.
In December 2024 the Oman Observer reported a 750-bed Seeb Tertiary Hospital planned at Sultan Haitham City and overseen by the Ministry of Health, with bids for its design package closed the month before. Al Suwaiq Hospital, in North Al Batinah, opened on 7 January 2026 with 260 inpatient beds, and the Ministry lists the opening of Khasab Hospital, in Musandam, on 11 January 2026.
None of the sources read names the medical gas or oxygen supplier of these hospitals, or says whether they will use PSA plants. Costs are left out, because the sources give different figures for the largest project. This guide does not cover the registration of medical devices in Oman.
The Al Falah Hospital announcement lists a fully integrated medical gas building, alongside a water treatment plant and backup generators. Ask whether a project tenders the medical gas plant as its own package or within the main works.
The Ministry of Health’s home page links to the Oman Tender Board e-tendering portal, which lists tenders by status and sub-contract tenders separately.
The portal says users can send enquiries about company registration and tendering through the national Tajawob platform, and lists a help desk for e-tendering enquiries.
For the Seeb Tertiary Hospital, bids for a design works and services package floated by the government closed in November 2024. Following a project from its design stage shows what is coming before equipment is bought.
Short and specific to a purchase in Oman. The general method is in the guides linked below.
The hospitals named here are Ministry of Health projects, but the tender portal pages read do not list hospital tenders as a category. Ask whether the plant is bought on its own or within the building contract, and confirm in each tender notice which body is buying.
Heat and dust both affect a PSA plant. Ask the buyer where the plant room is, how it is ventilated and how the air intake is filtered, then read our answers on heat and dust.
Ask the supplier for proof of registration with the authority that regulates medical devices in Oman. Ask the buyer to name the standard it requires in the specification. ULTRAOX plants are built to EN ISO 7396-1.
On the Oman Tender Board e-tendering portal, run under the Public Projects, Tenders and Local Content Authority. The Ministry of Health’s English home page links to it from its quick links. The portal lists tenders by status, but the pages read do not name hospital tenders as a category, so confirm in each tender notice which body is buying.
Ministry of Health and press reports name the new Sultan Qaboos Hospital in Salalah (700 beds), Al Falah Hospital in South Al Sharqiyah (170 beds) and the new Samail Hospital in Ad Dakhiliyah (170 beds). A 750-bed Seeb Tertiary Hospital was reported as planned in December 2024. Al Suwaiq Hospital opened in January 2026, and the Ministry lists the opening of Khasab Hospital the same month.
The Ministry of Health’s announcement of 2 December 2024 lists a fully integrated medical gas building among the hospital’s facilities, with backup generators and a water treatment plant. It does not say how the hospital’s oxygen will be produced or who will supply it.
No news story on this site reports an Ultra Controlo project in Oman. This page is a buying guide, built from public sources.
Ultra Controlo is certified to ISO 13485:2016 for medical devices, ISO 9001:2015 for quality management and ISO 14001 for environmental management. ULTRAOX plants are built to EN ISO 7396-1. For tenders, Ultra Controlo provides its certificates and technical dossiers.
UltraCare is Ultra Controlo’s technical assistance programme for its medical gas systems, available 24 hours a day, 365 days a year. It covers preventive maintenance and monitoring, corrective service, original spare parts and rental equipment while a unit is serviced.
ULTRAOX is designed for a minimum life cycle of 150,000 hours, which Ultra Controlo presents as an investment for at least 20 years.
Tell us about your site. Our engineering team sizes the configuration and sends a quote.