In December 2021 the World Bank reported two PSA oxygen plants it financed coming into operation at provincial hospitals in Nepal, procured and installed by UNOPS, with similar plants due in the other five provinces. WHO Nepal has since reported on spare parts, solar power and the consultations for Nepal’s first National Oxygen Roadmap. This guide sets out those public facts and what to check before you buy.
A World Bank press release of 5 December 2021 says two PSA oxygen generation plants financed by the World Bank came into operation as of that date at Lumbini Provincial Hospital and Janakpur Provincial Hospital. It said similar plants would be operational by 20 December 2021 at Damak Municipality Hospital, Hetauda Hospital, Western Regional Hospital, Karnali Provincial Hospital and Mahakali Provincial Hospital, in the remaining five provinces.
The release says the plants were procured, installed, and would be operated and maintained fully for three years by UNOPS, under the World Bank-financed COVID-19 Emergency Response and Health Systems Preparedness Project. It says they would supply medical oxygen to hospital facilities through the central medical gas pipeline system, where installed, and that the oxygen could also fill at least 24 cylinders of 46.7 litres for emergency back-up and for supply to peripheral hospitals or ambulances. On its Nepal page, UNOPS says it procured and installed duplex oxygen generation plants in each of Nepal’s seven provinces in response to the COVID-19 pandemic.
WHO Nepal has since reported on keeping PSA plants running: a solar power system for one hospital’s plant in 2023, spare parts kits in 2024 and hospital energy audits shared in 2026. In December 2025 and May 2026 the health ministry, with WHO support, held provincial consultations for Nepal’s first National Oxygen Roadmap.
World Bank, UNOPS and WHO figures are given as published. This guide does not cover the registration of medical devices in Nepal.
From three WHO Nepal updates, read on 23 November 2026. They are short news items: they give no tariffs, outage counts or plant capacities, and do not name the manufacturer of any plant.
In March 2023 WHO’s country office handed over a 150 kW photovoltaic solar power generation system to Province Hospital, Surkhet, in Karnali Province. WHO said the system would support the hospital’s PSA oxygen plant and other essential equipment, and help reduce operational cost by minimising the diesel needed to run the plant. The update gives no figure for the saving.
WHO reports energy assessments, supported by the European Commission and carried out between November and December 2025, at Nepal APF Hospital, Province Hospital Surkhet, Bakulahar Ratnanagar Hospital and Dolpa District Hospital. They covered power quality, backup systems and the energy requirements and reliability of medical oxygen systems, including PSA plants.
The audits produced site-specific solar PV and battery storage recommendations to safeguard critical services such as oxygen plants, ICUs and emergency departments during power outages. WHO describes Dolpa District Hospital as one of Nepal’s most geographically isolated facilities, with no on-site oxygen generation. The findings were shared with the hospitals in March 2026.
In January 2024 WHO handed over to the Ministry of Health and Population preventive maintenance kits for PSA oxygen plants, fit for a three-year period. WHO says the spare parts, supported by Unitaid, will be used to keep five oxygen plants functional at Tribhuvan University Teaching Hospital, Manmohan Cardiovascular and Thoracic Center and Paropakar Maternity and Women’s Hospital.
Read on 23 November 2026 in two WHO Nepal updates, of 14 January and 26 May 2026. They report consultations and hospital assessments for a roadmap then in development, not tenders or purchases.
| Point | What WHO reports |
|---|---|
| Koshi Province | A meeting on oxygen preparedness in Biratnagar on 12 December 2025, convened by the Health Emergency Operation Center at the Ministry of Health and Population, with technical support from WHO and catalytic funding from the Pandemic Fund |
| What Koshi discussed | The status and functionality of oxygen infrastructure, including PSA plants; participants emphasised the need to strengthen oxygen regulation, improve management of hospital-based oxygen plants and enhance emergency preparedness |
| Koshi field visits | An oxygen factory and a hospital-based PSA plant, to assess operational readiness, maintenance issues and supply chain challenges |
| Sudurpashchim Province | A provincial consultation and hospital assessment mission from 16 to 19 May 2026, with assessments at the Baitadi, Dadeldhura, Mahakali and Seti hospitals covering PSA plants, medical gas pipelines and electricity supply, among other points |
| Oxygen quality | WHO describes the programme as Nepal’s first systematic measurement of medical oxygen quality using 8-parameter medical gas analysers across multiple hospitals |
| Three national priorities | Reforming maintenance systems with reliable spare parts supply, strengthening technical workforce capacity and ensuring dedicated electricity supply for PSA plants |
| Next step | Sudurpashchim was the second of two provincial consultations, and WHO says their findings will inform the National Oxygen Roadmap |
A World Bank contract award notice published on 2 June 2021, under the COVID-19 Emergency Response and Health Systems Preparedness Project, records the procurement method as direct selection, for a 37-month contract to supply, install, operate and maintain seven oxygen generation plants for Nepal’s health ministry. It is an award notice, not an open call.
Nepal’s electronic public procurement system, Nepal e-GP at bolpatra.gov.np, describes itself as a place to discover public procurement opportunities and published projects across Nepal. This guide does not report any oxygen notice from it.
The WHO updates read for this guide describe handovers, consultations and assessments, not tenders, and do not name a supplier.
Short and specific to a purchase in Nepal. The general method is in the guides linked below.
In the cases read for this guide, the World Bank financed the 2021 provincial plants and UNOPS procured and installed them. WHO later handed over a solar system for the PSA plant at Province Hospital, Surkhet, and spare parts kits for five plants at three other hospitals. Ask whether the buyer is the health ministry, a hospital or a donor or UN agency, and where the call will be published.
The 2021 provincial plants came with three years of operation and maintenance by UNOPS, and the World Bank release does not say who runs them after that. WHO’s 2024 spare parts kits, for five plants at three other hospitals, were fit for a three-year period. Ask for the service plan in the offer: who maintains the plant, how spare parts reach the site and which hospital staff are trained to run it.
Stakeholders at the May 2026 consultation named dedicated electricity supply for PSA plants as a national priority, and WHO’s energy audits developed site-specific solar PV and battery storage recommendations to safeguard oxygen plants during power outages. Tell us what supply the hospital has, the size of its standby generator and how far the plant room is from the wards.
A World Bank press release of 5 December 2021 says the plants were financed by the World Bank, and were procured, installed and to be operated and maintained fully for three years by UNOPS, under the COVID-19 Emergency Response and Health Systems Preparedness Project. Two came into operation at Lumbini Provincial Hospital and Janakpur Provincial Hospital as of that date, and the release said similar plants would be operational in the remaining five provinces by 20 December 2021.
A World Bank contract award notice of 2 June 2021 records the purchase of seven oxygen generation plants under the same project as a direct selection.
WHO’s country office reported on 26 March 2023 that it handed over a 150 kW photovoltaic solar power generation system to Province Hospital, Surkhet, to support the hospital’s PSA oxygen plant and other essential equipment. WHO said solar energy would help reduce operational cost by minimising the diesel needed to run the plant, and the update gives no figure for the saving.
WHO Nepal reports that stakeholders at the Sudurpashchim provincial consultation of 16 to 19 May 2026 identified three national priorities: reforming maintenance systems with reliable spare parts supply, strengthening technical workforce capacity and ensuring dedicated electricity supply for PSA plants.
It was the second of two provincial consultations, after Koshi Province in December 2025, and WHO says the findings will inform Nepal’s first National Oxygen Roadmap.
The sources read for this guide give two cases. The 2021 World Bank release says UNOPS would operate and maintain the provincial plants fully for three years, and does not say who takes over after that.
In January 2024 WHO handed over to the Ministry of Health and Population preventive maintenance kits fit for a three-year period, supported by Unitaid, for five oxygen plants at Tribhuvan University Teaching Hospital, Manmohan Cardiovascular and Thoracic Center and Paropakar Maternity and Women’s Hospital.
No news story on this site reports an Ultra Controlo project in Nepal. This page is a buying guide, built from public sources.
UltraCare is Ultra Controlo’s technical assistance programme for its medical gas systems, available 24 hours a day, 365 days a year. It covers preventive maintenance and monitoring, corrective service, original spare parts and rental equipment while a unit is serviced.
ULTRAOX is designed for a minimum life cycle of 150,000 hours, which Ultra Controlo presents as an investment for at least 20 years.
Tell us about your site. Our engineering team sizes the configuration and sends a quote.