Africa Kenya Buying guide

Buying a PSA oxygen plant in Kenya.

Kenya launched its first medical oxygen roadmap, for 2025 to 2030, in May 2025. World Bank notices list medical gas piping contracts for county referral hospitals, and a 2025 PATH study found that spare parts for PSA plants were not commonly available among the suppliers it interviewed. This guide sets out those public facts and what to check before you buy.

ULTRAOX PSA medical oxygen generator by Ultra Controlo
What public sources say

What Kenya’s oxygen roadmap is meant to secure.

Kenya’s Ministry of Health launched the Kenya Medical Oxygen Roadmap 2025 to 2030 on 14 May 2025 in Nairobi. PATH, which acted as secretariat, says it was developed to sustain investment and secure resources for operational costs and preventive maintenance of medical oxygen.

In the same article, of 21 May 2025, PATH says access to high-quality oxygen in Kenya is still hindered by oxygen quality, inadequate quantities and distribution of oxygen devices, poor infrastructure, limited repair and maintenance, and inadequate training for health workers and biomedical engineers. The roadmap came with national guidelines on the production, delivery and management of medical oxygen, and with technical specifications for medical oxygen, oxygen therapy devices and equipment.

Among the roadmap’s focus areas, PATH lists infrastructure development for oxygen generation, storage and distribution, skilled personnel for equipment maintenance and clinical management, and sustainable financing for oxygen production, storage, distribution and maintenance.

Kenya
Public sources, read 21 November 2026
Oxygen roadmap
Kenya Medical Oxygen Roadmap 2025 to 2030, launched on 14 May 2025 in Nairobi (PATH, 21 May 2025)
Training reported
120 biomedical engineers trained in the repair and maintenance of oxygen plants across seven counties, under PATH’s SOURCE project
Piping contracts
Medical gas piping systems for county referral hospitals, in two World Bank award notices published on 6 January 2025 (project P173820)
Spare parts
Parts for PSA plants not commonly available among the suppliers PATH interviewed (PATH, July 2025)
Next project
INNOVATE, January 2026 to December 2029, with Kenya among five target countries (PATH factsheet, February 2026)
Grid
77% of the population had access to electricity in 2024, 67.1% in rural areas, and 74.6% of firms experienced electrical outages in 2025 (World Bank)

Partner reports are given as published. This guide does not cover medical device registration in Kenya. Ask the supplier for proof of registration with the Pharmacy and Poisons Board.

PATH on spare parts, July 2025

What a Kenyan study found about PSA plants.

From September 2024 to May 2025 PATH supported the Ministry of Health and the county governments of Nairobi, Nyeri and Meru on spare parts for 12 essential devices, PSA plants among them. Biomedical engineers agreed a list of 188 spare parts, and PATH collected data from 8 of the 17 distributors it targeted.

PSA plants left out of the analysis

A footnote of the report says spare parts for oxygen analysers and PSA plants were not commonly available among the suppliers interviewed, so the analysis did not include them: the sampled distributors gave no unit costs.

Service agreements may be why

PATH says this may be due in part to PSA plants having service agreements with authorised distributors who are tasked with maintenance, so there was no business case for distributors to stock their parts. PATH presents this as a possible reason, not a finding.

Parts ordered when needed

PATH says a majority of the distributors it targeted did not stock spare parts locally and relied on just-in-time ordering directly from manufacturers. It also notes that some donations arrive without details on the manufacturer or where to obtain spare parts.

Next: INNOVATE, 2026 to 2029

A PATH factsheet of February 2026 lists Kenya among the five target countries of INNOVATE, which PATH and partners run with Unitaid’s support, with KEMRI as a research lead. Its target business models include regional centralisation of spare parts and outsourcing the operation and maintenance of PSA plants. It does not say which will be tested in Kenya.

Three World Bank notices

What the piping contracts covered.

Read on 21 November 2026 in the World Bank procurement notices for project P173820, the Kenya COVID-19 Health Emergency Response Project. All three are contract award notices, not open tenders, and this guide gives no bidder names or prices.

PointKE-MOH-444502-GO-RFBKE-MOH-444416-GO-RFBKE-MOH-233868-CW-RFQ
Hospitals namedHola, Siaya and Kisumu county referral hospitals in the title; Hola (lot 1) and Kisumu (lot 2) in the scopeMakueni, Bungoma and Wamalwa Kijana, Kitale (Trans Nzoia) county referral hospitalsPumwani Hospital, Nairobi County (lot 1) and Kitui County Hospital (lot 2) in the title; Pumwani Hospital in the scope
SubjectSupply, delivery, installation, testing and commissioning of a medical gases piping systemSupply, delivery, installation, testing and commissioning of a medical gases piping systemMedical gas installation works
MethodRequest for BidsRequest for BidsRequest for Quotations
Award notified8 October 20248 November 202414 September 2021
Contract duration3 months3 months12 months
Notice published6 January 20256 January 202528 September 2023
Where tenders are published

Where Kenyan piping contracts have appeared.

The medical gas piping contracts read for this guide were published by the World Bank in its procurement notices, under project P173820 (Loan/Credit/TF Info IDA-65980). The two 2025 notices used the Request for Bids method and the 2023 notice used Request for Quotations.

Kenya’s Public Procurement Information Portal is at tenders.go.ke. This guide does not report any oxygen notice from it.

Before you buy

Three checks before you request a quote.

Short and specific to a purchase in Kenya. The general method is in the guides linked below.

01

Ask who services the plant

PATH found spare parts for PSA plants were not commonly available among the suppliers it interviewed, and says service agreements with authorised distributors may be part of the reason. Ask who will maintain the plant in Kenya and where its spare parts will come from.

02

Check the pipeline first

The World Bank contracts were for medical gas piping systems, and the notices do not say what oxygen source feeds each system. Tell us whether the hospital already has a pipeline and where the plant room will stand.

03

Plan power and training

In 2024, 77% of Kenya’s population had access to electricity, and in 2025, 74.6% of firms experienced electrical outages, World Bank data show. Tell us what backup power the site has, and settle in the offer how the hospital’s engineers will be trained.

Frequently asked questions

Questions from buyers in Kenya.

More on the medical gas answers page.

What does Kenya’s oxygen roadmap say about maintenance?

According to a PATH article of 21 May 2025, the Kenya Medical Oxygen Roadmap 2025 to 2030 was developed to sustain investment and secure resources for operational costs and preventive maintenance of medical oxygen. The article names limited repair and maintenance, and inadequate training for health workers and biomedical engineers, among the obstacles to access.

It reports that PATH’s SOURCE project trained 120 biomedical engineers in the repair and maintenance of oxygen plants across seven counties.

Which county hospitals had World Bank medical gas piping contracts?

Two contract award notices for World Bank project P173820, published on 6 January 2025, cover medical gas piping systems. One is titled for the Hola, Siaya and Kisumu county referral hospitals, and its scope names Hola (lot 1) and Kisumu (lot 2); the other is for the Makueni, Bungoma and Wamalwa Kijana, Kitale (Trans Nzoia) county referral hospitals. Each gives a contract duration of 3 months.

An earlier award notice, published on 28 September 2023, is titled for medical gas installation works at Pumwani Hospital in Nairobi County and Kitui County Hospital, and its scope names Pumwani Hospital. The notices do not say what oxygen source feeds each system.

What did PATH find about PSA plant spare parts in Kenya?

PATH’s July 2025 report on spare parts for priority medical equipment in Kenya says spare parts for PSA plants were not commonly available among the suppliers it interviewed, so its analysis left PSA plants out. PATH says this may be due in part to PSA plants having service agreements with authorised distributors who are tasked with maintenance.

The report does not say which PSA plant brands the facilities use or what the service agreements contain.

Does Ultra Controlo have projects in Kenya?

No news story on this site reports an Ultra Controlo project in Kenya. This page is a buying guide, built from public sources.

What documents does Ultra Controlo provide for a tender?

ULTRAOX oxygen plants carry CE marking as Class IIb medical devices through notified body 1639 (SGS), with the whole plant certified as a single medical device, and are built to EN ISO 7396-1. For tenders, Ultra Controlo provides its certificates, CE declarations of conformity and technical dossiers.

Who services an ULTRAOX plant after handover?

UltraCare is Ultra Controlo’s technical assistance programme for its medical gas systems, available 24 hours a day, 365 days a year. It covers preventive maintenance and monitoring, corrective service, original spare parts and rental equipment while a unit is serviced.

ULTRAOX is designed for a minimum life cycle of 150,000 hours, which Ultra Controlo presents as an investment for at least 20 years.

Request a project assessment

Ready to discuss oxygen for your hospital?

Tell us about your site. Our engineering team sizes the configuration and sends a quote.

CE 1639
Class IIb
ISO 13485:2016
80+ countries
40 years