Jamaica opened its first State-owned PSA oxygen plant at St Ann’s Bay in 2024, UNICEF called for the building of a second at May Pen in 2025, and Hurricane Melissa left hospitals on generators in late 2025. This guide sets out those public facts and what to check before you buy.
During COVID-19 the public health system came very close to running out of oxygen because it had one supplier, the health minister said in 2024. Since then, donors have paid for oxygen piping and the first State-owned PSA plant.
PAHO/WHO terms of reference from 2023 say COVID-19 created an oxygen gap in Jamaica because of limited oxygen infrastructure and production capacity. They list earlier steps: more medical oxygen storage at the National Chest Hospital, a liquid oxygen tank at Falmouth Hospital holding up to three weeks of its use, and a larger piped oxygen system at Spanish Town Hospital.
In August 2024 the Jamaica Observer reported the opening of the first State-owned medical oxygen plant, at St Ann’s Bay Regional Hospital, funded through UNICEF and the Government of Canada. The minister said it provides up to 530 litres of medical oxygen per minute at peak flow, can fill up to 137 cylinders of 20 litres in 24 hours, and complements the oxygen bought from the national supplier.
Press figures are given as reported. This guide does not cover the registration of medical devices in Jamaica, because we have not found an official text to cite.
Melissa made landfall as a Category 5 hurricane on 28 October 2025. On 13 November PAHO reported that most hospitals in the Western, Southern and North-Eastern health authorities still depended on generators for power.
On 11 November PAHO reported Port Maria Hospital running on a generator with a five-day fuel reserve, and Annotto Bay Hospital using a generator for radiology, with elective surgery on hold until grid power returned.
Black River Hospital, one of the eight in the 2023 piping call, lost every building except its accident and emergency unit to storm surge, PAHO reported. Its January 2026 report says immediate funding is needed to rebuild it.
PAHO reported that the three facilities retrofitted to its Smart standards in the storm’s path, at St Ann’s Bay, Mandeville and the Santa Cruz Health Centre, sustained at most minor damage. By January 2026 power was restored to all major public and private hospitals.
Read on 19 November 2026 on paho.org and UNGM. All three deadlines have passed, and none of the three is a call to supply a PSA plant.
| Point | PAHO/WHO piping designs | PAHO/WHO oxygen consultancy | UNICEF May Pen plant house |
|---|---|---|---|
| Reference | RFP JAM/ADM-2023-002 | Service contract notice, 2023 | O2Plant MayPen, then RFPS 9196720 |
| Subject | Designs and bills of quantities to upgrade and install oxygen piping in eight hospitals | An analysis of medical oxygen needs in the public sector and a national scale-up strategy | A single-storey building of 223 m² to house the oxygen plant at May Pen Hospital |
| Deadline | 4 p.m. EST, 19 June 2023 | 5:00 pm, 26 June 2023 | 16 May 2025 for the first notice and 25 July 2025 for the second |
| Who could respond | Individuals or companies, with proposals in English | Consultants, with a letter of interest and a CV | A Grade 1 general contractor in the first notice, Grade 1 and Grade 2 in the second, as identified by the National Contracts Commission |
| What it asked for | Piping for every bed and area that needs oxygen, designs that take in vacuum, air and nitrous oxide, and a lead consultant who knows NFPA 99 or AAMI | A need-gap analysis, capital and operating cost estimates, equipment lists, the placement of oxygen plants and staff and training needs | Technical and financial proposals as separate PDFs by email; an estimated six months of works and a 12-month defects liability period |
The donor calls read for this guide were published by PAHO/WHO on the service contracts pages of paho.org and by UNICEF Jamaica on the UN Global Marketplace (UNGM).
The government eTendering system at gojep.gov.jm, read on 19 November 2026, covers the tender cycle from supplier registration and competition notices to bid submission, evaluation and contract award notices. It links to the Public Procurement Commission’s lists of registered suppliers, for goods and services and for works by grade. This guide does not report any oxygen notice from it.
Short and specific to a purchase in Jamaica. The general method is in the guides linked below.
Ask whether the buyer is the Ministry of Health and Wellness, a regional health authority or a donor agency. Donor calls have appeared on paho.org and UNGM, and the government eTendering system is at gojep.gov.jm.
Two weeks after Melissa, most hospitals in three regional health authorities still ran on generators, PAHO reported. Tell us what generator the site has, how many days of fuel it keeps and where the plant room will stand.
At May Pen the plant house was tendered on its own, to graded contractors. At St Ann’s Bay eight biomedical engineers were trained on the plant before other staff, the Observer reported. Settle both in the offer.
The calls read for this guide were published by PAHO/WHO on paho.org, for oxygen piping designs and an oxygen consultancy in 2023, and by UNICEF on the UN Global Marketplace, for the May Pen oxygen plant house in 2025. The government eTendering system is at gojep.gov.jm.
PAHO/WHO’s RFP JAM/ADM-2023-002 asked for designs and bills of quantities to upgrade and install oxygen piping at the Princess Margaret, Victoria Jubilee, Black River, Lionel Town, Percy Junor, May Pen, Port Antonio and Port Maria hospitals, aiming to cover every bed and area that needs oxygen. Proposals were due on 19 June 2023.
UNICEF Jamaica asked construction firms to build a single-storey building of 223 m² to house the oxygen plant at May Pen Hospital, in an estimated six months with a 12-month defects liability period. The second notice, RFPS 9196720, sought Grade 1 and Grade 2 general contractors as identified by the National Contracts Commission, with technical and financial proposals as separate PDFs by email by 25 July 2025.
The notices do not say who supplies the plant itself.
The minister said in August 2024 that the plant provides up to 530 litres of medical oxygen per minute at peak flow and can fill up to 137 cylinders of 20 litres in 24 hours. The Jamaica Observer reported that eight biomedical engineers had already been trained on it.
PAHO reported on 13 November 2025 that most hospitals in the Western, Southern and North-Eastern health authorities still depended on generators. Its report covering 20 December 2025 to 22 January 2026 says power was fully restored to all major public and private hospitals, while several facilities still relied on backup systems.
No news story on this site reports an Ultra Controlo project in Jamaica. This page is a buying guide, built from public sources.
ULTRAOX oxygen plants carry CE marking as Class IIb medical devices through notified body 1639 (SGS), with the whole plant certified as a single medical device, and are built to EN ISO 7396-1. For tenders, Ultra Controlo provides its certificates, CE declarations of conformity and technical dossiers.
UltraCare is Ultra Controlo’s technical assistance programme for its medical gas systems, available 24 hours a day, 365 days a year. It covers preventive maintenance and monitoring, corrective service, original spare parts and rental equipment while a unit is serviced.
ULTRAOX is designed for a minimum life cycle of 150,000 hours, which Ultra Controlo presents as an investment for at least 20 years.
Tell us about your site. Our engineering team sizes the configuration and sends a quote.