France Overseas territories Tender guide

Medical gas tenders in France’s overseas territories.

Public hospitals in La Réunion, Martinique and Guadeloupe have tendered a medical air plant, an on-site oxygen plant, works on medical fluid networks and the maintenance of medical fluid installations, in notices on TED and BOAMP. In French Polynesia, a 2014 audit report describes a hospital oxygen unit. This guide sets out what those public sources say, and what to check before you request a quote.

ULTRAOX PSA medical oxygen generator by Ultra Controlo
Where tenders are published

How hospitals in these territories reach bidders.

The hospital buyers in La Réunion, Martinique and Guadeloupe publish notices on TED, in the Official Journal of the European Union, and on BOAMP. In the TED notices read for this guide, bids went in electronically, in French, on the platform each notice names.

This guide reads six of their notices, from 2022 to 2026. Five were published on TED; the sixth, the CHU de Martinique’s 2023 call for works on medical fluid networks, was published on BOAMP among contracts below the European thresholds. Three are for the maintenance of medical fluid installations, one for a medical air plant, one for an on-site oxygen plant and one for network works. All six had closed by 20 November 2026.

For French Polynesia, the public source is not a tender: it is a 2014 report of the territory’s audit chamber on the oxygen unit of the Centre hospitalier de la Polynésie française (CHPF).

Overseas territories
Public sources, read 20 November 2026
Territories covered
La Réunion, Martinique, Guadeloupe and French Polynesia
Where notices appear
TED, in the Official Journal of the European Union, and BOAMP
Hospital buyers
CHU de la Réunion, CHU de Martinique and GHT de la Guadeloupe
Notices read
Six, published from September 2022 to July 2026, all closed
How bids go in
Electronically and in French, in the five TED notices
French Polynesia
A 2014 audit chamber report on the CHPF’s oxygen unit

Each notice is one buyer’s call, not a rule for the territory. This guide does not cover French procurement law or the registration of medical devices.

Six notices side by side

What each notice asked for.

Each cell comes from the notice on TED or BOAMP, read on 20 November 2026. All six calls had closed by then, and this page reports no award.

Territory and yearNoticeBuyerWhat it asked forDeadline
La Réunion, 2026TED 468123-2026, published 7 July 2026CHU de la RéunionProvision, installation, commissioning, operation and maintenance of a medical air production plant at Saint-Benoît, to supply the GHER’s medical air installations, over an estimated 120 monthsMoved from 31 August to 7 September 2026 by a change notice; closed
La Réunion, 2023TED 584027-2023, published 29 September 2023CHU de la Réunion, for the GHT de La RéunionMaintenance of medical fluid installations in four lots: distribution at the CHU, the CHOR and the GHER, and cryogenic installations at the CHU’s southern site2 November 2023; closed
Martinique, 2026TED 72655-2026, published 2 February 2026CHU de MartiniqueMaintenance of the medical fluid installations and equipment of its establishments, for one year from 2 May 2026, renewable three times up to four years2 March 2026; closed
Martinique, 2023BOAMP 23-133191, September 2023CHU de MartiniqueWorks on the medical fluid distribution networks inside its buildingsMoved from 6 November to 27 November 2023 by two corrective notices; closed
Guadeloupe, 2022TED 511560-2022, published 20 September 2022GHT de la GuadeloupeAn on-site plant producing 95% medical oxygen, a back-up source and services for the Centre Hospitalier Sainte-Marie de Marie-Galante20 October 2022; closed
Guadeloupe, 2023TED 636661-2023, published 20 October 2023GHT de la GuadeloupeMaintenance of medical fluid installations in five lots, one per hospitalMoved from 20 November to 11 December 2023 by a corrigendum; closed
From the notices

Six points the notices make.

Maintenance is a contract of its own

Three of the six notices are service contracts for medical fluid installations: the CHU de la Réunion’s 2023 call in four lots, the CHU de Martinique’s 2026 call and the Guadeloupe hospital group’s 2023 call, with one lot per hospital. Lots 1 to 3 of the Réunion call included a supplementary service that the notice describes as possible and mandatory: a referent on site for a day or half a day.

Plant and service in one call

La Réunion’s 2026 notice covers the provision, installation, commissioning, operation and maintenance of a medical air plant over an estimated 120 months. The Marie-Galante notice joined preventive and corrective maintenance, telemetry monitoring and 24-hour, seven-day on-call cover to the oxygen plant and its back-up source.

Price is not the whole score

La Réunion’s 2026 notice weighted technical quality at 40, the plant’s energy consumption at 5 and price at 55. The CHU de Martinique scored price and technical value in 2026, and three other notices say price is not the only criterion, leaving the criteria to the tender documents.

Visit the site first

The CHU de Martinique’s 2026 notice and both Guadeloupe notices made a site visit mandatory. On Marie-Galante the visit, at the hospital’s medical gas slab, was to assess delivery and storage arrangements; in 2023 the Guadeloupe group asked bidders to book in writing 48 hours ahead.

Deadlines move

Three deadlines moved after publication: La Réunion’s 2026 call from 31 August to 7 September 2026, Martinique’s 2023 call twice, to 13 and then 27 November 2023, and Guadeloupe’s 2023 call from 20 November to 11 December 2023.

What candidates had to show

The CHU de Martinique’s 2023 notice listed professional references, average annual staff, technical equipment and a medical CE marking authorisation, written as habilitation au marquage CE médical. The 2023 Réunion notice and both Guadeloupe notices asked for the main deliveries or services of the last three years, proved by certificates from the recipient or by a declaration.

French Polynesia

A 2014 audit report on hospital oxygen.

The Chambre territoriale des comptes de la Polynésie française examined the management of the Centre hospitalier de la Polynésie française (CHPF) for 2008 to 2013, and adopted its final observations on 23 May 2014. It describes the CHPF, which moved to its Taaone site in October 2010, as the core of the territory’s health system.

In a section on savings measures, the report says a medical oxygen production unit was put into service in August 2013. Four generators of oxygen at 95%, in the report’s words, supplied the hospital network, backed up in case of failure by 120 cylinders giving 96 hours of emergency autonomy. Because of French Polynesia’s remoteness, a two-year stock of spare parts had been built up.

This is the hospital as the report described it in 2014, not its state today. The report does not name the technology, the output or the supplier of the generators, and this page does not repeat its cost estimates.

Before you bid

Three checks before you request a quote.

Short and specific to a call in France’s overseas territories. The general method is in the guides linked below.

01

Search the notices, then the platform

Look on TED and BOAMP for the words these notices use, such as fluides médicaux, air médical and oxygène médical. Each TED notice names the platform for documents and bids, and the latest change notice sets the deadline.

02

Book the mandatory visit early

Three of the six notices made a site visit mandatory. Both Guadeloupe notices asked for the visit certificate with the offer, and the 2023 one for a written booking 48 hours ahead.

03

Plan spares and service at a distance

The 2014 report on the CHPF records a two-year stock of spare parts because of the territory’s remoteness, and the Marie-Galante notice asked for telemetry and 24-hour on-call cover. Tell us which spare parts, monitoring and response times the hospital expects.

Frequently asked questions

Questions from buyers in France’s overseas territories.

More on the medical gas answers page.

Where do hospitals in France’s overseas territories publish medical gas tenders?

For La Réunion, Martinique and Guadeloupe, the notices read for this guide appeared on TED, in the Official Journal of the European Union, and on BOAMP, where the CHU de Martinique published its 2023 call for network works, below the European thresholds. Each TED notice names the platform for documents and bids: marches-publics.info for the CHU de la Réunion, marches-publics.gouv.fr for the CHU de Martinique and maximilien.fr for the Guadeloupe hospital group. For French Polynesia, the source read for this guide is a 2014 audit report, not a tender.

What did La Réunion’s 2026 medical air plant tender ask for?

TED notice 468123-2026, published on 7 July 2026 by the CHU de la Réunion, asked for the provision, installation, commissioning, operation and maintenance of a medical air production plant at Saint-Benoît, to supply the GHER’s medical air installations, over an estimated 120 months. It weighted technical quality at 40, the plant’s energy consumption at 5 and price at 55. A change notice moved the deadline to 7 September 2026, and the call has closed.

What did the Marie-Galante oxygen plant notice ask for?

TED notice 511560-2022, published on 20 September 2022 by the GHT de la Guadeloupe, asked for an on-site plant producing 95% medical oxygen, a back-up source and services for the Centre Hospitalier Sainte-Marie de Marie-Galante: installation, commissioning and acceptance, preventive and corrective maintenance, telemetry monitoring and 24-hour, seven-day on-call cover. A site visit was mandatory, and tenders closed on 20 October 2022.

Which medical fluid maintenance tenders did these hospitals publish?

Three of the notices read for this guide: the CHU de la Réunion’s 2023 call in four lots, for the distribution installations of the CHU, the CHOR and the GHER and the cryogenic installations of the CHU’s southern site, which closed on 2 November 2023; the CHU de Martinique’s 2026 call, which closed on 2 March 2026; and the Guadeloupe hospital group’s 2023 call in five lots, one per hospital, which closed on 11 December 2023.

What did the CHU de Martinique ask of bidders for its 2023 network works?

BOAMP notice 23-133191, published in September 2023, called for works on the medical fluid distribution networks inside the CHU’s buildings. Among the items for candidates, it listed professional references, average annual staff, technical equipment and a medical CE marking authorisation, written as habilitation au marquage CE médical. Two corrective notices moved the deadline from 6 November to 27 November 2023, and the call has closed.

What did a 2014 audit report say about oxygen at French Polynesia’s CHPF?

The Chambre territoriale des comptes de la Polynésie française, in final observations adopted on 23 May 2014, reported that the Centre hospitalier de la Polynésie française put a medical oxygen production unit into service in August 2013. Four generators of oxygen at 95% supplied the hospital network, with 120 cylinders as backup for 96 hours, and a two-year stock of spare parts had been built up because of the territory’s remoteness.

This describes the hospital in 2014, not today.

Does Ultra Controlo have projects in these territories?

No news story on this site reports an Ultra Controlo project in La Réunion, Martinique, Guadeloupe or French Polynesia. This page is a tender guide, built from public sources.

What documents does Ultra Controlo provide for a tender?

ULTRAOX oxygen plants carry CE marking as Class IIb medical devices through notified body 1639 (SGS), with the whole plant certified as a single medical device, and are built to EN ISO 7396-1. For tenders, Ultra Controlo provides its certificates, CE declarations of conformity and technical dossiers.

Who services an ULTRAOX plant after handover?

UltraCare is Ultra Controlo’s technical assistance programme for its medical gas systems, available 24 hours a day, 365 days a year. It covers preventive maintenance and monitoring, corrective service, original spare parts and rental equipment while a unit is serviced.

ULTRAOX is designed for a minimum life cycle of 150,000 hours, which Ultra Controlo presents as an investment for at least 20 years.

Request a project assessment

Ready to discuss oxygen for your hospital?

Tell us about your site. Our engineering team sizes the configuration and sends a quote.

CE 1639
Class IIb
ISO 13485:2016
80+ countries
40 years