A real case, in Central Africa
A hospital with 144 beds, 2 operating theatres and intensive care. The cylinder use and price are the hospital’s own; the plant has an indicative value. This is the calculation, step by step.
Consumption and cylinder price: the hospital’s own figures, November 2026. Plant: indicative value.
01 · What you pay today
02 · What you pay with the plant
Our engineers do the calculation with a plant sized for your hospital. No obligation.
04 · Two ways to get oxygen
Today
And at the end of the month, nothing is left.
With an ULTRAOX plant
And the plant stays in the hospital.
05 · Investment

Built for 150,000 operating hours.
It produces when the hospital uses oxygen. It can be connected to the diesel generator.
The whole ULTRAOX plant, certified as one single medical device.
Plus or minus 3%, in line with the European Pharmacopoeia and the USP.
Ultra Controlo: Portuguese manufacturer of medical gas plants, in Abrunheira.
Next step: a site visit or a meeting with our engineers.
Prefer to write? leads@ultra-controlo.com